Vantage helped a private liberal arts college evolve its institutional information security program to better meet its growing technology and data security needs.
read more
Sutter Health CPMChttps://www.vantagetcg.com/wp-content/uploads/2021/01/Sutter-Health-CPMC-VNG-Command-Center-1024x683.jpg1024683Vantage Technology Consulting GroupVantage Technology Consulting Group//www.vantagetcg.com/wp-content/uploads/2018/07/newLogoVantage.png
The new Sutter Health CPMC Hospital will have a women’s and children’s program which will include labor and delivery, postpartum, neo-natal ICU’s, pediatrics and pediatric ICUs. Additional services will include emergency services, oncology, cardiology, transplant and joint replacement, all housed in the new 740,000 square foot building.
read more
Sutter Health CPMChttps://www.vantagetcg.com/wp-content/uploads/2019/01/Sutter-Health-CPMC-MBC-NICU-1024x695.jpg1024695Vantage Technology Consulting GroupVantage Technology Consulting Group//www.vantagetcg.com/wp-content/uploads/2018/07/newLogoVantage.png
In response to California Senate Bill 1953 requiring all acute care hospitals and medical facilities to meet stringent seismic design standards, Sutter Health California Pacific Medical Center (CPMC) began the design and construction of a new seven-story, 215,000 square foot, 120-bed acute-care hospital on the existing St. Luke’s Campus in the Bernal Heights neighborhood of San Francisco. The new hospital, to be known as CPMC Mission Bernal Campus…
read more
Vantage managed the design, engineering, OSHPD coordination and construction administration for the upgrade of the Kern Medical Center’s Telemetry System infrastructure.
read more